First, thank you for developing and maintaining such a great product. It is indeed the simplest and more robust RoboCopy alternative I have worked with.
There is one thing that I have noticed though, and that is that if you manually run a job that has a schedule, then the next scheduled run gets skipped.
For example: a job is scheduled to run every day at 10:00 PM. Its next scheduled run is Monday at 10:00 PM. If I manually run the job (for any reason whatsoever) at 2:00 PM on Monday, then the system skips the 10:00 PM run on Monday and the next scheduled run becomes Tuesday at 10:00 PM.
Sometimes we need to run jobs manually in addition to their normal scheduled runs (testing, unscheduled synchronizations, etc.)
Am I missing something on the configuration that is causing this behavior?
Thanks!
There is one thing that I have noticed though, and that is that if you manually run a job that has a schedule, then the next scheduled run gets skipped.
For example: a job is scheduled to run every day at 10:00 PM. Its next scheduled run is Monday at 10:00 PM. If I manually run the job (for any reason whatsoever) at 2:00 PM on Monday, then the system skips the 10:00 PM run on Monday and the next scheduled run becomes Tuesday at 10:00 PM.
Sometimes we need to run jobs manually in addition to their normal scheduled runs (testing, unscheduled synchronizations, etc.)
Am I missing something on the configuration that is causing this behavior?